Covair Tennis Domes - Sizes and Prices

 

Tennis Dome Standard Sizes Complete Dome

Replacement

Membrane (Every 5 years)

Ground

Anchors

Single Court 18m x 36.5m (60' x 120') £18,900 £7,300 £12,000
Two Courts 36.5m x 33m x 9m (120' x 108') £28,300 £12,000 £16,000
Three Courts 36.5m x 48.5m x 9m (120' x 159') £34,100 £14,200 £19,000
Four Courts 36.5m x 66m x 9m (120' x 216') £45,700 £19,200 £23,000
Labour/materials charge to add extra revolving/emergency doorway to membrane: £250

 

 

 

 

 

 

 

 

 

 

 

 

Please note all prices are subject to VAT.

 

 

Complete dome prices include membrane, wire rope reinforcing network, one revolving door, two fans, anchor fittings and installation labour. Delivery time, accommodation and mileage will be charged per location. Foundation work and electrical switchgear are not included. A concrete ring beam around 750x750mm is required for anchorage with a 1750 x 1750 x 120mm level concrete pad central across the beam for the revolving door. If ground conditions permit, we are able to offer ground anchors as an alternative to a ring beam.

Replacement membranes are normally required after four/five years and prices include fitting but not delivery or removal of the old membrane. We do not have the facility to dispose of old membranes.

An electronics package is available that includes fan control panel, switching that will bring in the second fan if the first fan stops turning and a wind speed sensor (anemometer) that switches on the second fan if the wind rises above a preset level. An auto-start backup generator is available to combat power cuts and a second panel incorporating wind speed indicator, internal pressure gauge and emergency alarm can be installed in the dome.

For seasonal domes a concrete pad is needed adjoining the ring beam at the same level, to enable the trolley with dome on to be rolled off court for the summer. The trolley should then at least be covered with a solar proof tarpaulin or preferably a steel/wood shed, which can also house the fans and electrics.

 

Fees


Dismantling and re-erection charges are between £400 and £1500 depending on condition, size of dome, help provided and distance from base. Overnight stays could double this. A 2-court requires 3 men & a 3-court requires 4 men.

Terms


35% with order, balance due on day of erection/delivery.

Delivery


Normally 6 - 8 weeks from receipt of deposit but longer for September - November installations.

If you require a replacement membrane to be fitted from September - November, we need to receive your written order with 35% deposit before the 1st of June stating your preferred installation date. This is due to the hectic re-erection schedule we experience during this period and allows us to manufacture during the summer months and guarantee your dome for the coming season.

 

 